usmts



How To Use Mr. Gasket GM LS Engine Alignment Tools

Mr. Gasket Alignment Tools make it easy to install GM LS timing covers and rear covers and get rid of all the guesswork. Compatible with all LS applications and available in three versions – one for timing covers with a seal, one for timing covers without a seal, and one for rear covers – they center the cover and ensure correct alignment to the centerline of the crankshaft.

Unlike the front and rear cover for most engines, LS applications don't have dowel pins to locate them, which often creates unnecessary leaks if they're not centered properly. That's where budget-friendly, easy-to-use Mr. Gasket Alignment Tools come in. To install a front cover, first make sure your cover and gasket surfaces are clean and then dab a little RTV on the corners. Put the cover in place, but don't torque it down – just make it finger-tight. Make sure to lube the O-rings with a little oil so they don't stick or tear. Now place the alignment tool onto the crank snout, making sure that bottom of the timing cover is flush with the engine block. Snug up the bolts, working your away around the perimeter in a crisscross pattern. Check to be sure you can spin the tool as you tighten the bolts. Then just torque everything down to 18 foot-pounds using the same crisscross pattern.

For the rear cover, the process is virtually the same – just use the lower two oil pan bolts to pull the cover down so you can insert the alignment tool. Tap the tool in with a rubber mallet and snug down all the bolts, then torque them to 18 foot-pounds and torque the pan bolts to 106 inch-pounds. Install the rear main seal, using a rubber mallet on the tool to tap-in the rear seal, torque the remaining bolts, and you're done.

Latest Videos


USMTS Spring Salute April 19 @Arrowhead

The USMTS Spring Salute featuring the Summit USMTS National Championship presented by RacinDirt takes place on Friday, April 19, at the Arrowhead Speedway in Colcord, Okla. The event…






News

Featherlite Fall Jamboree remains unfinished business due to weather

A second attempt to complete the 25th Annual Featherlite Fall Jamboree, which was shortened by rain last September, is the latest victim to the early Spring weather. The 25th Annual USMTS Featherlite Fall Jamboree-do that was set for this Friday and Saturday, April 26-27, will remain unfinished business. The event has been canceled due to impending rain and bitter cold in the forecast, and w



Chisholm checkers ARMI Contractors USMTS Spring Salute


Sooner State doubleheader awaits USMTS


Photos


RacinDirt USMTS King of America XIII 4/4/24


14th Annual USMTS Texas Spring Nationals Night 2 of 2